In order to solve the problem that the mechanical insulated joint of the high speed railway station is damaged, the carrier frequency information of the adjacent track circuit is interfered with each other, which affects the safety of the track circuit, a protective choke matching transformer is proposed. Firstly analyzing the different damage situations of the mechanical insulated joint of the high-speed railway station, and introducing the structure of the current transformer. Then the structure principle and parameter calculation method of protective choke matching transformer are introduced. Finally, the theoretical analysis and experimental results show that the protective choke matching transformer can eliminate the interference of the carrier frequency of the adjacent track circuit and meet the anti-interference requirement.
[1] Li, Z. Y., Zheng, S., Xu, Z. Q. and Zhao, Y., “Analysis on the Coupling Disturbance of ZPW-2000A Jointless Track Circuit under High Speed Condition and Counter measures,” China Railway Science, Vol. 31, pp. 98–106 (2010). (Chinese)
[2] Tang, X. T., “Problems and Countermeasures of Parameter Adjustment of ZPW-2000 Track Circuit in High Speed Railway,” Science and Technology Innovation Guide, Vol. 35, pp. 7071 (2014). (Chinese)
[3] Li, X. P., Study of Unbalanced Traction Current on Track Circuit Interference, Beijing Jiaotong University (2012). (Chinese)
[4] Shi, L. J., “The Adjustment and Test Method of ZPW2000A / K Track Circuit,” Shanghai Railway Science and Technology, Vol. 2, pp. 103104 (2012). (Chinese)
[5] Shi, X. M., “Discussion of Engineering Application for Station Integrated Track Circuit,” China Railway, Vol. 6, pp. 913 (2008). (Chinese)
[6] Bi, H. J., Zhao, X. and Zhang, M. H., “Analysis of Potential Difference of Mechanical Insulating Joint in High Speed Railway Station,” Journal of Beijing Jiaotong University,Vol.5,pp. 151156 (2013). (Chinese)
[7] Zhang, D. Q., “Analysison Insulation Section Burning Problem of Shanghai-Nanjing High Speed Railway,” Shanghai Railway Science and Technology, Vol. 2, pp. 4344 (2011). (Chinese)
[8] Xu, Z. Q. and Ye, J. B., “Discussion on the Damage of Mechanical Insulation Section of High-speed Railway Station,” Journal of Railway Communications, Vol. 11, pp. 1922 (2012).
[9] Li, Q. and Fan, L. J., “Study on the Problem of the Track Circuit Signal with the Same Carrier Frequency in the Adjacent Block Sections,” China Railway Science, Vol. 1, pp. 108111 (2011). (Chinese)
[10] Chang, Z. N., “Discussion on the Relationship between Traction Power Supply System and Signal Equipment,” Electrified Railway, Vol. 2, pp. 1820 (2007). (Chinese)
[11] Kong, Y. Q. and Wang, Y. Y., “Research on Anti-interference Methods about Unbalanced Traction Current on Track Circuit,” Electronic Quality, Vol. 1, pp. 22 24 (2014). (Chinese)
[12] Wu, X. C. and Li, G. Q., “Research on Immunity to Electric Impulsive Interference of ZPW-2000 Track Circuit in Station,” International Journal of Security and Its Applications, Vol. 1, No. 10, pp. 257264 (2016). doi: 10.14257/ijsia.2016.10.1.24
[13] Dong, Y., Interval Signal and Train Operation Control System,China Railway Press,Beijing(2014).(Chinese)
[14] Ministry of Railway of P. R. China, TB/T 3073–2003 EMC Tests and Limits for Railway Electrical Signaling Apparatus, China Railway Press, Beijing (2003). (Chinese)
[15] Cao, M. G., Research of Modeling and Test on Impedance Bond in the High Speed Railway, Beijing Jiaotong University (2014). (Chinese)
[16] Yang, S. W., Research on Interference upon Track side Signaling from Electrical Railway under High Speed and Heavy Haul Conditions, Beijing Jiaotong University (2015). (Chinese)